Das Verbundprojekt
Intelligente HS-Isoliersysteme wurde gefördert durch Mittel der Investitionsbank Berlin (IBB) und des Europäischen Fonds für regionale Entwicklung (EFRE).
Projekte
Referenzliste 1993-2012 (englisch):
Project |
Location / Application |
Year |
Position |
Duties / Topics |
ETG conference „Diagnostik elektrischer Betriebsmittel“ |
Fulda, Germany |
2012 |
Chairman session |
Generators and Motors |
Prequalification Test of 145kV XLPE Cable System |
Mannheim, Germany |
2012 |
Expert Engineer |
PD measurements |
On-site test of 45kV special test container |
Bremen, Germany |
2012 |
Test Engineer |
AC voltage and lightning impulse test |
Fault analysis of HV cable joints |
Altdorf, Switzerland |
2012 |
Consultant |
Visual inspection |
Valve support structure of static var compensator |
Nürnberg, Germany |
2012 |
Expert Engineer |
LI and AC tests, PD measurements |
On-site Test of 400kV XLPE Cable System |
Randstad380, Delft, NL (European Largest EHV Land Cable Project) |
2012 |
Expert Engineer |
PD measurements |
Fault analysis of 18MVA converter transformers |
Bad Arolsen, Germany |
2012 |
Consultant, Expert Engineer |
Visual inspection, PD measurements |
On-site Test of 110kV Cable Systems |
Lingerhahn and Oberheimbach, Germany |
2012 |
Expert Engineer |
PD measurements |
Development of a compact 10kV/50kJ switching impulse generator |
for testing of traction converters |
2012 |
Expert Engineer |
Design, Simulation, Development, Install, commissioning, customer training |
Comparative PD measurements on MV circuit breaker |
Berlin, Germany |
2012 |
Expert Engineer |
PD measurements, investigation |
Voltage tests on 80MW HV motors |
Berlin, Germany |
2012 |
Test Engineer |
AC voltage test |
Diagnosis of short-circuit test transformer |
Berlin, Germany |
2012 |
Expert Engineer |
Impedance measurements |
Comparative PD measurements on dry-type transformer |
Molinazzo di Monteggio, Switzerland |
2012 |
Expert Engineer |
PD measurements, investigation |
Location of subsea HVAC cables |
PLIB, post-lay inspection burial |
2012 |
Consultant |
Consultancy, investigation |
Inspection of 37MVA turbo generator |
Zorbau, Germany |
2012 |
Inspector |
Inspection |
AC HV test equipment |
for 220 kV cable accessories routine and development testing |
2012 |
Consultant |
Consultancy, witnessing |
Failure analysis on 16.4MW ring motor |
Support for failure investigation |
2012 |
Consultant |
Consultancy, investigation |
Automatic Ks-factor measuring system |
for EHV cables with large cross-section conductors |
2012 |
Expert Engineer |
Development |
Acceptance test of 18MVA dry-type converter transformers |
Bordentown, NJ, USA |
2012 |
Expert Engineer |
PD measurements via Internet remote connection |
Ks-factor determination of 400kV cable conductor |
Mannheim, Germany |
2012 |
Expert Engineer |
Impedance measurements, data evaluation |
Acceptance test of 16MVA dry-type converter transformer |
Molinazzo di Monteggio, Switzerland |
2011 |
Expert Engineer, Consultant |
Witnessing of complete type test |
On-site Tests of 11MVA converter transformer |
Wardenburg, Germany |
2011 |
Expert Engineer |
Induced Voltage Test and PD measurements |
Ks-factor determination of large cross-section cable conductors |
Köln, Germany |
2011 |
Expert Engineer |
Impedance measurements, data evaluation |
Furnace transformer |
Hamburg, Germany |
2011 |
Expert Engineer, Consultant |
Consultancy |
Optimization of measuring impedance |
for PD monitoring system |
2011 |
Expert Engineer, Consultant |
Development, Consultancy |
On-site Test of 110kV Cable System, 10km |
Dresden, Germany |
2011 |
Expert Engineer |
PD measurements |
ISH conference |
Hannover, Germany |
2011 |
Chairman session E6 |
Advanced materials and insulation systems |
Prequalification Test of 220kV XLPE Cable System |
Wuhan, China |
2011 |
Expert Engineer |
PD measurements |
Acceptance test of 4 18MVA dry-type converter transformers |
Bordentown, NJ, USA |
2011 |
Expert Engineer |
PD measurements via Internet remote connection |
Jicable conference |
Versailles, France |
2011 |
Chairman session B8 |
Partial discharges and diagnostics (1) |
On-site test of 90MVA power transformer |
Fujairah, UAE |
2011 |
Test Engineer |
Induced voltage test |
On-site test of 220kV Cable Accessories |
Jamnagar, India |
2011 |
Expert Engineer |
UHF PD measurements |
Dielectric analysis of 24MVA/110kV rectifier transformer |
Cavenago di Brianza, Italy |
2011 |
Consultant |
Consultancy |
On-site Test of 150kV Cable System, 16km |
Rostock, Germany |
2011 |
Expert Engineer |
PD measurements |
Improved dielectric design for 30kV dry-type converter transformers |
Bordentown, NJ, USA |
2011 |
Consultant |
Consultancy |
PD measurements of 18MVA dry-type converter transformers |
London, UK |
2011 |
Consultant |
Consultancy |
Diagnosis of short-circuit test transformer |
Berlin, Germany |
2011 |
Expert Engineer |
Impedance measurements |
Ks-factor determination of 400kV cable conductor |
Mannheim, Germany |
2011 |
Expert Engineer |
Impedance measurements, data evaluation |
On-site test of 45kV special test container |
Bremen, Germany |
2010 |
Test Engineer |
AC voltage and lightning impulse test |
Offline PD measurements on 10kV 3-core cables |
Olkiluoto, Finland |
2010 |
Test Engineer |
AC voltage test, PD measurements |
Online PD measurements on 800kV current transformer |
Bamberg, Germany |
2010 |
Consultant |
Consultancy |
On-site test of 400kV Cable Accessories |
Maasbracht, Netherlands |
2010 |
Expert Engineer |
PD measurements |
PD measurements on 18MVA dry-type converter transformer |
Pittsburgh, USA |
2010 |
Expert Engineer |
Consultancy, PD measurements |
PD measuring technology |
Turgi, Switzerland |
2010 |
Consultant |
Consultancy |
On-site Test of 132kV Cable Accessories |
Dubai, U.A.E. |
2010 |
Expert Engineer |
PD measurements |
Test of 5MVA converter transformer |
Bremen, Germany |
2010 |
Expert Engineer |
PD measurements |
Offline and online investigations of dry-type transformer no-load losses |
Regensburg, Germany |
2010 |
Expert Engineer |
Perform and evaluate no-load measurements |
Investigations on Interferences in a HV Lab for routine tests of cable accessories |
Altdorf, Switzerland |
2010 |
Consultant |
Propose improvements to reduce PD noise level |
Fault analysis of 11MVA converter transformer |
Bad Arolsen, Germany |
2010 |
Consultant |
Visual inspection |
AC testing of stator insulation |
Berlin, Germany |
2010 |
Consultant |
Design, Engineering |
ECC monitoring |
for HV cable systems in Qatar |
2010 |
Expert Engineer, Consultant |
Development, Consultancy |
On-site Test of 380kV GIL (Gas Insulated Line) |
Riyadh, Saudi Arabia |
2010 |
Expert Engineer |
PD measurements |
Routine tests of HV motors |
Berlin, Germany |
2010 |
Expert Engineer |
Consultancy, PD measurements |
Extension of transformer test field |
Germany |
2010 |
Consultant |
Design, Engineering |
On-site Cable Testing |
for MV sea cable in Korea |
2010 |
Consultant |
Consultancy |
On-site Tests of 5 11MVA converter transformers |
Wardenburg, Germany |
2010 |
Expert Engineer |
Induced Voltage Test and PD measurements |
Fault analysis of 8MVA furnace transformer |
Modena, Italy |
2010 |
Consultant |
Witnessing of tests, visual inspection |
Diagnosis of short-circuit test transformer |
Berlin, Germany |
2010 |
Expert Engineer |
Impedance Measurements |
On-site Test of HV XLPE Cable Systems |
Kelsterbach, Germany |
2010 |
Expert Engineer |
PD measurements |
On-line Test of 380kV Cable GIS terminals |
Berlin, Germany |
2010 |
Expert Engineer |
PD measurements |
Investigation on impulse stress for rotating machine insulation |
Birr, Switzerland |
2010 |
Expert Engineer |
PD measurements |
Test of long AC Sea Cable on turn table |
Köln, Germany |
2010 |
Expert Engineer |
PD measurements |
AC loss measurements on EHV cable with large conductor cross section |
Brugg, Switzerland |
2010 |
Expert Engineer |
Ks-factor Measurements |
Investigation on optical PD measurements for HV Cable Accessories |
Brugg, Switzerland |
2010 |
Expert Engineer |
PD measurements |
On-site Tests of 40MVA converter transformers |
Sundsvall, Sweden |
2009 |
Expert Engineer |
Induced Voltage Test and PD measurements |
Test of 7MVA converter transformer |
Bad Arolsen, Germany |
2009 |
Expert Engineer |
PD measurements |
SVL monitoring for EHV cable systems |
Berlin, Germany |
2009 |
Expert Engineer |
Development, performance tests |
AC loss measurements on EHV cable with large conductor cross section |
Köln, Germany |
2009 |
Expert Engineer |
Ks-factor Measurements |
Test of 40MVA power transformer |
Naples, Italy |
2009 |
Expert Engineer |
No load and load losses measurement |
On-line Test of 40MVA converter transformer |
Sundsvall, Sweden |
2009 |
Expert Engineer |
PD measurements |
Expert Training on Partial Discharge Measurements |
KEMA, Arnheim, Netherlands |
2009 |
Consultant |
Prepare and Conduct Courses |
On-line Test of HV XLPE Cable Systems |
Jeddah and Dammam, Saudi Arabia |
2009 |
Expert Engineer |
PD measurements |
Motor-Generator test system for induced voltage tests of dry-type transformers |
Berlin, Germany |
2009 |
Expert Engineer |
Design, Install, commissioning, customer training |
On-site Test of 690MVA power transformer |
Maasbracht, Netherlands |
2009 |
Expert Engineer |
Applied voltage test and tan delta measurements |
On-site Test of 20 dry-type transformers |
Berlin, Germany |
2009 |
Expert Engineer |
Induced Voltage Test and PD measurements |
PD sensors for cable accessories |
Berlin, Germany |
2009 |
Expert Engineer |
Investigations on sensor performance |
On-line Test of HV XLPE Cable Systems |
Rio de Janeiro, Brazil |
2009 |
Expert Engineer, Consultant |
PD measurements, Prepare and Conduct Presentations |
PD monitoring on large power generators |
Grenoble, France |
2009 |
Consultant |
Prepare and Conduct Presentations |
Training on Partial Discharge Theory and Measurements |
Beijing, Wuhan, China |
2009 |
Consultant |
Prepare and Conduct Courses |
HV Impulse generator for transformer manufacturer |
Bad Arolsen, Germany |
2009 |
Expert Engineer |
Install, commissioning, customer training |
Investigation on PD pulse location accuracy for Siemens Power Generation |
Berlin, Germany |
2009 |
Expert Engineer |
PD measurements |
On-site Test of HV XLPE Cable Systems |
Doha, Qatar |
2008 |
Expert Engineer |
PD measurements |
Recommendations and Guidelines for the Application of Partial Discharge Monitoring System Technology to HV XLPE Cable Lines for National Grid, UK |
London, UK, and Cologne, Germany |
2008 |
Consultant |
To prepare the study |
On-site Test of HV XLPE Cable Systems |
Madrid, Spain |
2008 |
Expert Engineer |
PD measurements |
Investigations on Interferences in a Low-Noise HV Lab |
Ramsloh, Germany |
2008 |
Consultant |
Propose improvements to reduce PD noise level |
Investigation on UHF PD measurements for HV Cable Accessories |
Brugg, Switzerland |
2008 |
Expert Engineer |
PD measurements |
On-site Test of HV XLPE Cable Systems |
Verona, Italy |
2008 |
Expert Engineer |
PD measurements |
AC loss measurements on EHV cable with large conductor cross section |
Mannheim, Germany |
2008 |
Expert Engineer |
Ks-factor Measurements |
PD measurements on 500kV HVDC Transformer |
Siemens Nürnberg, Germany |
2008 |
Expert Engineer |
PD measurements |
Online PD measurements on 420kV Current Transformer |
Brugherio, Italy |
2008 |
Expert Engineer |
PD measurements |
DC PD measurements on Sea Cables |
Halden, Drammen, Norway |
2008 |
Expert Engineer |
PD measurements |
Training on After-installation Testing of HV Cable Systems and On-site PD measurements |
Vilnius, Lituania |
2008 |
Consultant |
Prepare and Conduct Courses |
Training on Partial Discharge Theory and Measurements |
Beijing, Shanghai, Kunming, Wuhan, China |
2008 |
Consultant |
Prepare and Conduct Courses |
HV/EHV Cable PD Monitoring |
Beijing, China |
2008 |
Consultant |
Cooperation in development of PD monitoring system for Sindia, China |
Business Development Monitoring |
Berlin, Germany and Klaus, Austria |
2007 - 2010 |
Management, Expert Engineer |
Strategic Planning |
On-site Test of 780MVA and 740MVA Three-Phase Power Transformers |
Nuclear Power Plant, Krümmel, Germany |
2007 |
Expert Engineer |
Induced Voltage Test and PD measurements |
On-line Test of 12 97MVA Single-Phase HVDC Transformers |
Hydro Power Plant |
2007 |
Expert Engineer |
PD measurements |
On-site Test of 740MVA Three-Phase Power Transformer |
Nuclear Power Plant, Krümmel, Germany |
2007 |
Expert Engineer |
Induced Voltage Test and PD measurements |
On-site Test of 420MVA Single-Phase Power Transformer |
Nuclear Power Plant, Almaraz, Spain |
2007 |
Expert Engineer |
Applied and Induced Voltage Test, PD measurements |
On-site Test of 400kV XLPE Cable Systems |
Ferrara, Italy |
2007 |
Expert Engineer |
AC Resonant Test, PD measurements |
Training on Partial Discharge Theory and Measurements |
Berlin, Germany |
2007 |
Consultant |
Prepare and Conduct Courses |
On-site Test of HV XLPE Cable Systems |
Several Locations, Spain |
2005 - 2007 |
Expert Engineer, Consultant for DOEL, LCOE and LABEIN |
PD measurements |
On-site Test of 420MVA Single-Phase Power Transformer |
Nuclear Power Plant, Cofrentes, Spain |
2006 |
Expert Engineer |
Applied and Induced Voltage Test, PD measurements |
On-site Test of two 97MVA Single-Phase HVDC Transformers |
Hydro Power Plant Cahora Bassa, Songo, Mozambique |
2006 |
Expert Engineer |
Applied and Induced Voltage Test, PD measurements, Diagnosis, DC Test |
Assessment of Quality of High Voltage Extruded Cable for ConEd, NY |
Queens, NY and Berlin, Germany |
2006 |
Consultant |
To prepare the study with test procedure |
HV Motor Testing |
Austin, Texas |
2006 |
Consultant |
PD measurements |
MV Cable Test Field |
Bydgoszcz, Poland |
2006 |
Consultant |
Investigation on Partial Discharge Measurement Procedure |
On-site On-line Test of HV XLPE Cable Systems |
Lumut Power Plant, Malaysia |
2006 |
Expert Engineer |
PD measurements |
On-site Test of 400kV XLPE Cable Systems |
Rotterdam, Netherlands |
2004 - 2007 |
Expert Engineer |
AC Resonant Test, PD measurements |
On-site Test of 400kV XLPE Cable System |
Elstree - St. John´s Wood, London, UK (World Largest EHV Cable On-site Test Project) |
2005 |
Project Leader, Expert Engineer |
AC Resonant Test, PD measurements |
On-site Test of Stator Windings of Large Hydro Generators |
Hydro Power Plant Aswan, Egypt |
2004 - 2005 |
Expert Engineer |
PD and Tan Delta Measurements |
Training on Partial Discharge Theory and Measurements |
Dubai, U.A.E. and Bangalore, India |
2005 |
Consultant |
Presentation, Practical Training |
On-site On-line Tests on 220kV Three-Phase Power Transformer |
Craiova, Romania |
2004 |
Expert Engineer, Consultant |
PD measurements, Consultancy |
On-site Test of Stator Windings of Large Hydro Generators |
Pump Storage Power Plant Markersbach, Germany |
2004 |
Expert Engineer |
PD measurements |
Witnessing of HV/EHV Circuit Breaker Type Testing (on behalf of PEHLA) |
Berlin, Germany |
2002 - 2004 |
Expert Engineer |
Dielectric Tests |
On-site Test of 345kV XLPE Cable Systems |
Tainan, Taiwan |
2002 - 2003 |
Expert Engineer |
AC Resonant Test, PD measurements |
On-site Test of 400kV XLPE Cable Systems |
UW Mitte - UW FRH, Berlin, Germany (World first on-site cable test with 400kV AC test voltage level and distributed PD meaurements) |
1998 |
Project Leader, Expert Engineer |
AC Resonant Test, PD measurements |
Opto-acoustic sensing of PD |
Berlin, Germany |
2005 - 2007 |
Project Leader |
Development of New Sensors, Application, Research |
Prequalification Tests HV/EHV XLPE Cable Systems and GIL |
IPH Berlin, Germany |
1997 - 2007 |
Project Leader, Test Engineer |
PQ Tests acc. to IEC62067 |
Type and Special Tests on MV/HV/EHV Apparatus |
IPH Berlin, Germany |
1997 - 2007 |
Leader IPH High Voltage Laboratories, Test Engineer, Project Leader |
Testing, Test Business Development |
Development of a New Synchronous Multi-channel PD Measuring System |
Berlin, Germany (Mtronix, TU Berlin and IPH) |
1997 - 2005 |
Consultant |
Research, Consultancy, Lead User Experience |
Prequalification Test of six 400kV XLPE Cable Systems (CESI 2) |
CESI Milan, Italy |
1995 - 1997 |
Consultant |
Research, Testing, Project Communication, Reporting |
Diagnosis on Water-tree deteriorated MV PE/XLPE Cables |
TU Berlin, Germany |
1995 - 1997 |
Senior Researcher, Project Leader |
Research, Development, Diagnosis |
Prequalification Test of six 400kV XLPE Cable Systems (CESI 1) |
CESI Milan, Italy |
1993 - 1995 |
Consultant |
Research, Testing, Project Communication, Reporting |
Development of a New DSP-based Tan Delta Measuring System for Research |
TU Berlin, Germany |
1993 - 1995 |
Senior Researcher, Project Leader |
Research, Development, Diagnosis |
|
|
|
|
|